Quick Answer

Iraq has three horizontal datums in the EPSG registry, not one. IGRS (EPSG 3889) on the GRS 1980 ellipsoid is the current national system, covering onshore and offshore. Karbala 1979 (EPSG 4743) is the legacy national network that IGRS replaced, and Nahrwan 1934 (EPSG 4744) remains registered for oil and gas work. The Iraq National Grid exists twice, once on Karbala 1979 for cadastre and once on ED50 for military survey, with identical projection parameters. Confirm datum and grid before production.

Iraq covers roughly 38.79°E to 48.61°E and 29.06°N to 37.39°N in the EPSG envelopes for its national systems, and across that span the geodetic registry carries three horizontal datums from three different eras, two separate definitions of the country's own National Grid, two vertical datums, and one IGS station that stopped reporting in July 2023. Any one of those details is enough to put a stake in the wrong place. Together they make a pre-mobilization check mandatory rather than optional.

This guide sets out what the EPSG registry actually says about each piece, how the three datums relate to one another, where the National Grid naming becomes ambiguous, and what correction strategy is realistic given the current state of the reference-station network.

Handheld RTK GNSS receiver used for survey field work

3horizontal datums in the EPSG registry for Iraq: Nahrwan 1934, Karbala 1979 and IGRS
1IGS reference station inside Iraq, ISBA00IRQ, last data recorded 2023-07-14
0.9994scale factor at the natural origin of the Iraq National Grid (EPSG 6646 and 3893)
432 mmagnitude of the published Karbala 1979 to WGS 84 translation vector, 70.995, −335.916 and 262.898 m

Figures come from the EPSG registry entries for Nahrwan 1934 (4744), Karbala 1979 (4743), IGRS (3889), UTM zones 37N to 39N on both datums (3391 to 3393 and 3890 to 3892), the Iraq National Grid (6646 and 3893), Nahrwan 1934 / Iraq zone (3394) and UTM zone 37N (7005), IKBD-92 (4667), the vertical systems Fao 1979 (3886) and Fao (5751), and the official IGS network station list read on 3 November 2026.

1. Why Iraq's Datum Question Is Three Questions in One

Most country guides can be built around a single datum. Iraq cannot, because the registry keeps the old systems alive alongside the new one, and each of them still has a legitimate use.

Nahrwan 1934 is scoped by EPSG to oil and gas exploration and production. Karbala 1979 is scoped to geodesy, engineering survey and topographic mapping, and its own registry entry states that it replaces Nahrwan 1934 and was itself replaced by IGRS. IGRS is scoped as the horizontal component of the 3D system and covers Iraq both onshore and offshore, which the earlier datums do not. Read as a sequence, the three entries describe a handover that took place in two stages, and both earlier stages are still referenced in the field.

The practical consequence is that the question "what datum is this data in?" has three plausible answers rather than one, and the coordinates themselves usually will not tell you which is correct. Two of the datums share the same ellipsoid, so even the shape of the numbers offers no hint. Only the metadata, the project documentation or a check against known control points will settle it.

2. The Three Horizontal Datums Registered for Iraq

The table below reproduces the registry values for each datum rather than a rounded summary, because the difference between the two classical datums is small enough that rounded figures would hide it.

Datum EPSG code Ellipsoid Semi-major axis and inverse flattening Translation to WGS 84 Scope
Nahrwan 1934 4744 Clarke 1880 (RGS) a = 6,378,249.145 m; 1/f = 293.465 dX = −242.2 m, dY = −144.9 m, dZ = 370.3 m Oil and gas exploration and production
Karbala 1979 4743 Clarke 1880 (RGS) a = 6,378,249.145 m; 1/f = 293.465 dX = 70.995 m, dY = −335.916 m, dZ = 262.898 m Geodesy, engineering survey, topographic mapping
IGRS (Iraqi Geospatial Reference System) 3889 GRS 1980 a = 6,378,137 m; 1/f = 298.257222101 0, 0, 0 Horizontal component of 3D system

Both classical datums are computed on Clarke 1880 (RGS) with identical ellipsoid parameters, so the ellipsoid cannot be used to distinguish them. The registered areas of use differ: Karbala 1979 covers Iraq onshore, Nahrwan 1934 covers Iraq onshore together with the onshore northern Gulf coast of Iran and the area west of the Iran border in southeast Iraq.

Two things follow from those numbers. First, the relationship between the two classical datums is not small: the two published translation vectors to WGS 84 differ by roughly 382 m in magnitude, so treating one as a stand-in for the other is a hundreds-of-meters error, not a few centimeters. Second, IGRS carries a zero translation because it is realized on GRS 1980, the same ellipsoid family used by modern global reference frames — which is exactly why IGRS is the datum an RTK crew should be working in when a project allows the choice.

The registry wording for the handover is explicit and worth quoting, because it settles arguments faster than any secondary source. The Karbala 1979 entry records that the geodetic network was established by the Polservice consortium, that it replaces Nahrwan 1934 and that it was replaced by IGRS. The Nahrwan 1934 entry records that in Iraq it was replaced by Karbala 1979, and that in Iran it was replaced by FD58. Neither relocation of the legacy systems means the legacy coordinates have disappeared from project archives.

One further entry deserves a caution. IKBD-92 (EPSG 4667) is an Iraq-Kuwait boundary datum built on the WGS 84 ellipsoid with a zero translation, and its registered scope is boundary demarcation only, over an area limited to the Iraq-Kuwait boundary. It is a demarcation tool, not a survey datum for the country, and using it as a general-purpose frame would be a misapplication of something that looks numerically convenient.

3. UTM Zones 37N, 38N and 39N

Iraq is wide enough to span three UTM zones, and EPSG registers a separate projected coordinate system for each zone on both the current and the legacy national datum. The zone split follows longitude as usual, and the registry states the boundaries explicitly in each entry.

Zone Area of use IGRS (current datum) Karbala 1979 (legacy datum)
UTM zone 37N Iraq west of 42°E EPSG 3890 EPSG 3391
UTM zone 38N Iraq between 42°E and 48°E EPSG 3891 EPSG 3392
UTM zone 39N Iraq east of 48°E EPSG 3892 (onshore and offshore) EPSG 3393 (onshore east of 48°E)

Each entry uses the standard UTM belt definition on its respective datum: a 0.9996 scale factor at the central meridian, a 500,000 m false easting and a zero false northing. The zone choice changes projected coordinates only; it does not change the datum shift.

The distinction that catches crews is the pairing, not the projection. A coordinate pair in zone 38N can belong to either IGRS or Karbala 1979, and the easting and northing values will look completely normal in both cases. The zone number tells you where the point is; it tells you nothing about which datum produced it.

For a point near the registry coordinates of the country's only IGS station — 33.341°N, 44.438°E — the longitude falls inside zone 38N, whose central meridian is 45°E. Points in the far west approach the 42°E boundary and points in the far east cross 48°E, so a project that spans the country will legitimately touch all three zones. Recording the zone in the deliverable metadata is not optional housekeeping when the same site can be described in two adjacent zones.

4. The Iraq National Grid: One Projection, Two Datums

This is the single most important detail in this guide. The EPSG registry contains two projected coordinate systems named Iraq National Grid, and they share identical projection parameters while sitting on different datums.

Property EPSG 6646 EPSG 3893
Name Karbala 1979 / Iraq National Grid ED50 / Iraq National Grid
Datum Karbala 1979 ED50 (International 1924 ellipsoid)
Projection method Transverse Mercator Transverse Mercator
Latitude of natural origin 29.0262683333333° 29.0262683333333°
Longitude of natural origin 46.5°E 46.5°E
Scale factor at natural origin 0.9994 0.9994
False easting / northing 800,000 m / 0 m 800,000 m / 0 m
Translation to WGS 84 70.995, −335.916, 262.898 m −87, −98, −121 m
Scope Cadastre Military survey
Area of use Iraq onshore Iraq onshore

Every projection parameter is identical between the two entries. Only the datum, and therefore the datum shift, differs. A delivered easting and northing pair therefore cannot identify which system produced it.

The consequence is concrete. When a client hands over a set of Iraq National Grid coordinates without stating the datum, the numbers are internally consistent and appear entirely plausible, and yet the two possible interpretations differ by the difference between the two datum shifts — on the order of several hundred meters. No amount of inspection of the digits resolves it, because the projection that produced those digits is the same in both cases.

The fix is procedural, not computational. Ask which EPSG code the deliverable is specified against, and record the answer in the project metadata alongside the easting and northing. Where the source documentation is silent, differentiate by scope: the registry assigns 6646 to cadastre and 3893 to military survey, so the provenance of the coordinate list is the most reliable available clue. Then confirm against a control point with known coordinates in both frames before production work begins.

One exclusion also matters here. EPSG registers two further legacy projected systems that are easy to confuse with the national grids: Nahrwan 1934 / Iraq zone (EPSG 3394), a Lambert Conformal Conic system with a 45°E central meridian, a 0.9987864078 scale factor and a 1,500,000 m / 1,166,200 m false origin, and Nahrwan 1934 / UTM zone 37N (EPSG 7005). Both belong to the oil and gas lineage rather than the national mapping lineage, and neither should be substituted for the National Grid on a cadastral or engineering deliverable.

5. Vertical Datums: Fao 1979 and Fao

Heights in Iraq follow the same pattern as the horizontal systems: a national vertical reference and an oil-sector parallel, both registered and both still in use.

Vertical system EPSG code Scope Area of use
Fao 1979 height 3886 Geodesy, engineering survey Iraq onshore
Fao height 5751 Oil and gas exploration and production Iraq onshore southeast; Iran onshore northern Gulf coast and area west of the Iran border in southeast Iraq

Both are gravity-related height systems expressed in meters. Their scopes mirror the horizontal split: the 1979 system serves general geodesy and engineering, while the undated Fao system carries the oil and gas scope and a slightly wider geographic area.

The parallel with the horizontal systems is exact, and that is the point. A project that adopts Nahrwan 1934 for horizontal control in an oil-field context is likely to be working in Fao height for the vertical, while a cadastral or infrastructure project using the national horizontal systems is likely to be working in Fao 1979 height. Mixing one of each produces a deliverable whose plan position and level come from different eras of the same national geodetic history.

For GNSS-derived heights, the practical warning is that an ellipsoidal height from an RTK solution is not a height above either Fao reference. A geoid model, or a local transformation derived from benchmarks in the project area, is required before GNSS heights can be compared with anything on a drawing. Whether a given project should adopt a global geoid model or a legacy local datum is a decision for the client and the responsible survey authority; the deliverable should state which was used.

6. CORS and Correction Sources in Iraq

Correction strategy is where Iraq differs sharply from most countries with a mature national network, and the reason is visible in the reference-station record.

Parameter Registered value
IGS reference stations in Iraq 1 — ISBA00IRQ
Registered coordinates 33.341°N, 44.438°E, height 72.400 m
Receiver / antenna TRIMBLE NETR5 (GPS and GLONASS) / TRM57971.00 with no radome
Antenna reference point BAM, with zero marker offsets recorded
Last data recorded 2023-07-14
Most recent final products 2023-07-09 for the analysis centers listed in the registry

Values read from the official IGS network station list on 3 November 2026. The station record is retained in the network registry, but the last data field dates to July 2023.

That single record changes the planning assumption. A country with an active national network lets a crew rely on network RTK and treat a local base as a contingency. Where the only registered reference station last contributed data in 2023, a local base station is the primary plan rather than the fallback, and the survey design should be built around a base-rover configuration from the start.

GNSS base station configured for local RTK correction broadcast

The regional picture reinforces the same conclusion. Across the IGS network, Saudi Arabia registers three stations, Turkey six and Iran two, while Kuwait and Jordan register none. For work in central or southern Iraq, the nearest continuously operating reference stations are therefore outside the country, which makes long-baseline network solutions less attractive than a well placed local base with a short baseline to the rover.

The practical rule that follows: budget for a base station, plan its position so that the rover stays inside a short baseline for the whole survey, and treat any third-party network correction service as a supplement to be verified rather than as the foundation of the survey design. Where a network service is available, check which datum its mountpoint publishes in — a network correction delivered in a legacy frame will not produce IGRS coordinates just because the rover is configured to display them.

7. Field Workflow: Running RTK in Iraq

Bringing the pieces together, a defensible workflow for an Iraqi project follows a fixed order. The sequence matters more than any single step, because each step depends on the datum decision made in the one before it.

1
Establish the datum of the existing data
Ask which EPSG code the client's coordinates are registered against. The plausible answers are 3889 for IGRS, 4743 for Karbala 1979 and 4744 for Nahrwan 1934. Record the answer before any equipment leaves the office, and where the answer is genuinely unknown, plan a control-point comparison rather than assuming the newest datum.
2
Establish the projected system, including the EPSG code
For UTM work, confirm the zone from longitude: 37N west of 42°E, 38N between 42°E and 48°E, 39N east of 48°E. For National Grid work, resolve which of the two definitions applies, 6646 on Karbala 1979 for cadastre or 3893 on ED50 for military survey, since the projection parameters are identical and the datum is not.
3
Set the transformation and verify it on known control
Configure the controller with the geocentric translation that matches the datum in use, and confirm the configuration by occupying a point with published coordinates. A datum error of several hundred meters shows up immediately at this stage and not at all later, which is why the check is worth its time.
4
Plan the base before the first rover day
With one registered IGS station and its last data in July 2023, plan a local base on a known point, keep the rover baseline short for the duration of the survey, and record the base coordinates, the antenna height and the correction format used. Where a network service supplements the base, record which mountpoint and which datum it publishes.
5
Resolve heights separately from plan position
Decide whether the deliverable requires Fao 1979 height, Fao height, or ellipsoidal heights, and apply the corresponding geoid model or local transformation. Document the choice, because ellipsoidal heights will not reconcile with legacy level data on their own.
6
Publish datum, grid and transformation in the deliverable
State the horizontal datum, the projected system with its EPSG code, the transformation applied and the vertical reference. On an Iraqi deliverable this metadata is the difference between a coordinate list that can be used and one that has to be resurveyed.

The pattern across all six steps is that the technical work is straightforward once the metadata is settled, and expensive when it is not. None of the steps requires exotic equipment. All of them require that the question be asked.

8. FAQ

What is the current geodetic datum of Iraq?

IGRS, the Iraqi Geospatial Reference System, registered as EPSG 3889. It is computed on the GRS 1980 ellipsoid with a semi-major axis of 6,378,137 m and an inverse flattening of 298.257222101, and its area of use covers Iraq both onshore and offshore. The EPSG entry for Karbala 1979 records that Karbala 1979 was replaced by IGRS.

Which datum is an older Iraqi coordinate list likely to be in?

Most likely Karbala 1979, EPSG 4743, which the registry scopes to geodesy, engineering survey and topographic mapping and describes as the network established by the Polservice consortium. A list originating from oil and gas work may instead be in Nahrwan 1934, EPSG 4744, whose registered scope is oil and gas exploration and production. The two are on the same ellipsoid, so the coordinate format will not distinguish them; check the project documentation or compare against known control.

Why are there two different Iraq National Grid definitions?

Because the same projection is registered on two datums for two different communities. EPSG 6646 is Karbala 1979 / Iraq National Grid with a scope of cadastre, and EPSG 3893 is ED50 / Iraq National Grid with a scope of military survey. Both use a Transverse Mercator projection with a latitude of natural origin of 29.0262683333333°, a central meridian of 46.5°E, a scale factor of 0.9994 and a false easting of 800,000 m. Because the projection parameters are identical, a delivered easting and northing pair alone cannot tell you which datum it is in.

Which UTM zone applies to central Iraq?

Zone 38N, which the registry defines as Iraq between 42°E and 48°E, with a central meridian of 45°E. On IGRS the entry is EPSG 3891 and on Karbala 1979 it is EPSG 3392. The registered coordinates of the country's only IGS station, 33.341°N and 44.438°E, fall inside this zone.

Is there a CORS network available in Iraq?

The IGS network registers one station inside Iraq, ISBA00IRQ, with registered coordinates of 33.341°N, 44.438°E and a height of 72.400 m, equipped with a TRIMBLE NETR5 receiver and a TRM57971.00 antenna. Its last recorded data date is 2023-07-14, with the most recent final products dated 2023-07-09. In practice a local base station is the primary correction strategy rather than a backup. For comparison, the same registry lists three stations in Saudi Arabia, six in Turkey and two in Iran.

What vertical datum is used in Iraq?

Two are registered. Fao 1979 height, EPSG 3886, is scoped to geodesy and engineering survey over Iraq onshore. Fao height, EPSG 5751, is scoped to oil and gas exploration and production and covers Iraq onshore southeast together with the Iranian onshore northern Gulf coast. Both are gravity-related height systems in meters. GNSS ellipsoidal heights are not referenced to either, so a geoid model or a local transformation derived from benchmarks is needed before GNSS heights can be compared with legacy level data.

PLANNING SURVEY WORK IN IRAQ?

Tell us your datum, projection and correction strategy, and we will help you configure an RTK setup that holds up in the field.

Send an Inquiry →WhatsApp Us →

About the author: Marin Hu writes about GNSS hardware and field surveying practice for APEKS GNSS, combining marketing work with hands-on equipment experience.